Safety-First Protocols: Dedicated sections for LOTO (Lockout/Tagout) verification, PPE checks, and area isolation to ensure every inspection starts safely.
Comprehensive Health Checks: A guided path through visual, structural, and fluid inspections to catch "invisible" wear and tear before it becomes a critical failure.
Performance Verification: Step-by-step functional testing instructions to ensure gauges, alarms, and moving parts are operating within manufacturer specifications.
Compliance & Documentation: A structured format for recording pass/fail rates, notes on defects, and requisite sign-offs, helping you stay audit-ready for OSHA and ISO.
Facility & Plant Managers: Looking to standardize reporting across shifts.
Maintenance Technicians: Needing a reliable field reference during rounds.
Safety (EHS) Officers: Ensuring maintenance procedures align with safety regulations.